I tore this box down completely and tapped it myself. It has worked awesome for a few years now. It pushes 40" stickies around no problem. The box is the stock one off my 93 YJ. The cylinder is a surplus center 8" stroke 1.5" bore. I welded a bung to the big end for a hiem joint. I'm going links and full hydraulic so I need to let this go.
Located in Birmingham ,Alabama
250$ obo for gear box, cylinder, and the 2 hoses as pictured with fittings, hiem, etc...
Idk why the pictures are sideways, but I can't fix it on this stupid Kindle.
Located in Birmingham ,Alabama
250$ obo for gear box, cylinder, and the 2 hoses as pictured with fittings, hiem, etc...
Idk why the pictures are sideways, but I can't fix it on this stupid Kindle.