Main gate is open. Road to the campground is still blocked and closed. Road and 1st parking lot has 12" of snow and it was snowing heavily today. There were only 2 vehicles up there today and one was stuck and winching in the parking lot. Tow rigs will get stuck until it warms up for a few...
Omak area has cheap land. Most trees were burned up in the big fire. $500-$1000 an acre. Big parcels and not many residences to complain. About 5 hours travel time from the wet side.
I can give the road engineer a ride up in my truck if that is what the hold up is. Do you know his name? Rent me a dozer and I will cut in a new road for free.
I called and talked to the lady at the front desk (360-825-6585 ext 0) and she said May 1st at the soonest. They are waiting for the snow to melt and the engineer is still engineering a road fix.