Menu
Forums
New posts
Search forums
Calendar
Monthly
Weekly
Agenda
Archive
What's new
New posts
New media
New media comments
New profile posts
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
New profile posts
Search profile posts
Log in
Register
What's new
Search
Search
Search titles and first posts only
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Help Support Hardline Crawlers :
Forums
Rock Crawling Forums
Trail Rides & Competitions
Kaner work party report
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="benw1" data-source="post: 1490880" data-attributes="member: 16017"><p>Once arriving at the site, we walked through the trail and the forest service described the work that needed to be done in each area and assigned group leaders for each task. The first area, immediately off the road was a small hill and meadow that was rutted and dug out from vehicles climbing up on to the trail. This section was to be ripped and smoothed with the equipment and have erosion control matting placed to control runoff and stabilize the soil. </p><p></p><p>The next section dropped down to a marshy area with a wooden bridge that looked like it was perpetually wet, and clearly had a massive amount of erosion from heavy use. From the low area there was a hill climb out. The FS had already started work in this area and mentioned that the chute on the uphill had walls 6'+ high that they had already pulled down and smoothed out. This area was to be smoothed, drainage improved, and restored. The FS wanted the bridge removed so they could salvage the materials. </p><p></p><p>Atkins and his crew along with the FS equipment operators started on these sections while we continued the walk through of the rest of the project.</p><p></p><p>Here is the start of the section that is relocated to the road</p><p></p><p><img src="http://img88.imageshack.us/img88/7674/42711609.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p></p><p>Unfortunately I didn't get any before pictures, but here are the results. </p><p></p><p><img src="http://img826.imageshack.us/img826/1469/60047356.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://img51.imageshack.us/img51/8217/39269523.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://img94.imageshack.us/img94/9489/63899271.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://img26.imageshack.us/img26/6672/44176658.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://img208.imageshack.us/img208/5962/41574400.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://img217.imageshack.us/img217/7216/74435924.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p></blockquote><p></p>
[QUOTE="benw1, post: 1490880, member: 16017"] Once arriving at the site, we walked through the trail and the forest service described the work that needed to be done in each area and assigned group leaders for each task. The first area, immediately off the road was a small hill and meadow that was rutted and dug out from vehicles climbing up on to the trail. This section was to be ripped and smoothed with the equipment and have erosion control matting placed to control runoff and stabilize the soil. The next section dropped down to a marshy area with a wooden bridge that looked like it was perpetually wet, and clearly had a massive amount of erosion from heavy use. From the low area there was a hill climb out. The FS had already started work in this area and mentioned that the chute on the uphill had walls 6'+ high that they had already pulled down and smoothed out. This area was to be smoothed, drainage improved, and restored. The FS wanted the bridge removed so they could salvage the materials. Atkins and his crew along with the FS equipment operators started on these sections while we continued the walk through of the rest of the project. Here is the start of the section that is relocated to the road [IMG]http://img88.imageshack.us/img88/7674/42711609.jpg[/IMG] Unfortunately I didn't get any before pictures, but here are the results. [IMG]http://img826.imageshack.us/img826/1469/60047356.jpg[/IMG] [IMG]http://img51.imageshack.us/img51/8217/39269523.jpg[/IMG] [IMG]http://img94.imageshack.us/img94/9489/63899271.jpg[/IMG] [IMG]http://img26.imageshack.us/img26/6672/44176658.jpg[/IMG] [IMG]http://img208.imageshack.us/img208/5962/41574400.jpg[/IMG] [IMG]http://img217.imageshack.us/img217/7216/74435924.jpg[/IMG] [/QUOTE]
Insert quotes…
Verification
Post reply
Latest posts
Official "Post your trail riding pics" Thread
Latest: ridered3
Today at 3:54 PM
General Discussion
Coalmont TN OHV New Park info
Latest: ridered3
Yesterday at 3:48 PM
General Discussion
Trying to get it mostly right the first time: A 5.9 Magnum and 46RE swapped, Tummy Tucked Daily Driven Jeep TJ
Latest: ridered3
Thursday at 10:08 AM
Tech & Fab
2.5 ton rockwell pattern wheels
Latest: semperfi1919
Wednesday at 7:38 PM
Wanted to Buy
T
For Sale
85-91 Ford Kingpin Dana 60 $2k
Latest: truck-oholic
Tuesday at 4:29 PM
Off Road 4x4 Parts For Sale
Forums
Rock Crawling Forums
Trail Rides & Competitions
Kaner work party report
Top