• Help Support Hardline Crawlers :

Sold/Expired cj7 project crawler

Status
Not open for further replies.

thyde0092

New Member
Joined
Mar 19, 2014
Messages
1
I have a cj7 that needs completing it needs the steering to be put together, the rear brake lines, carb rebuilt, cage tied to the frame, shifters put in, and the drive shafts made. the motor is a chevy 350 with a 350 turbo trans, It has dana 60 front and rear locked in the rear with 39 supper swampers tsl like new. I also have new fox 2.0 air shocks to go with it. if you have any more questions fell free to text or call (205)907-2170 I am located in Birmingham 4500 obo
 
Status
Not open for further replies.
Top