• Help Support Hardline Crawlers :

Project No Name

We are leaving Tuesday mid-morning. A lot of the little things have been done, and the cage is painted, floors done & painted, seats are going in, on all fours, coilovers set-up, drivelines in, brakes all done and all wired. Need to finish the hydraulic lines, cooling hoses, and fire it. Shooting for Sunday and Mon. as an oh crap day.
I will have more pics up tonight.
 
From yesterday, left the camera at the shop today,
Cage and floors done and painted.

projects586ek9.jpg
 
With the exception of a few cosmetic things, bleeding the steering and finishing the fuel injection, the rig is basically complete.

projects589si7.jpg


projects593gq4.jpg


projects592cw1.jpg
 
Damn Pat. That is a fawking awesome jeep. I never thought i wouls say it but that is the nicest jeep i have seen.Where are the action pics?
 
We ran Moab Rim trail, but after some baja racing at the top, the radiator & fan meet leaving me to coast down the trail and keeping us from running any others, we were ready to come home anyways. The rig performed bueatifully, climbs ledges w/o effort, super stable even way off camber, soaks up the 2' and smaller stuff great at speed and is very predictable and no handling quirks.
Here are a few from the trip up

easterjeep07023wf6.jpg


easterjeep07024ho8.jpg


easterjeep07048si5.jpg


easterjeep07049pw1.jpg
 
Last edited:
Top