Markrobinson
Well-Known Member
- Joined
- Aug 13, 2010
- Messages
- 700
I've got all the outer stuff you need to build a 9", 14 bolt, etc front end.
The unit bearings are used super duty ones, bored for 35 spline shafts and redrilled to 8 on 6.5". The stub shafts are 10 factory 35 spline. The drive flanges are rock and roll offroad.
I had it set up on a nissan center section, so you'll need to cut out the axle ends where they are welded onto the inner C's. I also have a set of 2500hd rotors as calipers I was going to adapt to it as well that ill throw in.
I am thinking $1000 but open to offers. That's about twice what I paid for everything.
615 848 4348
The unit bearings are used super duty ones, bored for 35 spline shafts and redrilled to 8 on 6.5". The stub shafts are 10 factory 35 spline. The drive flanges are rock and roll offroad.
I had it set up on a nissan center section, so you'll need to cut out the axle ends where they are welded onto the inner C's. I also have a set of 2500hd rotors as calipers I was going to adapt to it as well that ill throw in.
I am thinking $1000 but open to offers. That's about twice what I paid for everything.
615 848 4348