The new "Crashfab"

Hardline Crawlers - Rock Bouncer Builds, Tech & Off-Road Trail Talk

Help Support Hardline Crawlers:

I think they might, but I ended up at Valley Supply in Maltby for the stuff I bought. I just bought some a week ago. If I would have known you needed some we could have thrown down on a roll. :mad: A roll is 432 feet long, 12.5 feet wide.

I know it is cheaper if you buy the whole roll, rather than having it cut.
 
I think they might, but I ended up at Valley Supply in Maltby for the stuff I bought. I just bought some a week ago. If I would have known you needed some we could have thrown down on a roll. :mad: A roll is 432 feet long, 12.5 feet wide.

I know it is cheaper if you buy the whole roll, rather than having it cut.

Was there a per foot price?
 
DO it now, or do it twice...or more. Take the time now, and make the slope one direction....
 
Hah! :ANYWORD::fawkdancesmiley:
My daughter on the other hand....Sheeeeit, 11 going on gonna drive a man to killin'...She listens to them...
How do you know them? :masturbanana[1]::stirpot:
 
Hah! :ANYWORD::fawkdancesmiley:
My daughter on the other hand....Sheeeeit, 11 going on gonna drive a man to killin'...She listens to them...
How do you know them? :masturbanana[1]::stirpot:

Ummm tv or something :booo:
 
In a couple of weeks the Willy's will be ready. Perhaps finally get this project out of your hair???
 
Mike your new setup is damned nice. Good job Sir!

I plan to retire in a similar setup, except where your office is will be my living space. Wife wants to retire in an apartment overlooking the sound. Not my cup of tea so we may have to time share in our old age lol.

Your shop is a really nice and reasonable setup.
 
Thanks Jacob--the hard work and planning certainly payed off..

Its funny about 10 years ago we were looking into plans of doing a shop with an apartment over top but never went too far with it..
 
A shop with living quarters over the top would be my dream home!:redneck:
 
Did you ever find your road fabric? I have multiple pieces of rolls at our yard in Snohomish. PM me if you need it.
 
I had to put it all on the back burner but looking at getting back into it here very soon--wanna get the base done before the birthday bash weekend.
 
So with having it dirt thru the winter I was able to see what the rain did and how.

So I found over by the outhouse water runs off the hill and collects badly after a hard rain and there is a big hump in the center that forces water towards the shop so one more reworking of the area was needed and some sort of drain system is needed.
 

Attachments

  • 20150418_201640.jpg
    20150418_201640.jpg
    56.3 KB
  • 20150419_083929.jpg
    20150419_083929.jpg
    73.4 KB
  • 20150418_200431.jpg
    20150418_200431.jpg
    64.4 KB
Here is the start of the drainage. I originally planned on just doing this ditch for the water to collect but after some thought and the fact I still have drainage to do in front of the other shop and the downspout off the new shop I revised my plan.
 

Attachments

  • 20150509_074343.jpg
    20150509_074343.jpg
    96.6 KB
So part A.

Luckily I took pics and was able to easily found where the end of the drain pipe is that I did last year. Ditch dug from my new shop downspout to the drain.

Part B will be a little tougher..
 

Attachments

  • 20150509_084727.jpg
    20150509_084727.jpg
    59.4 KB
  • 20150509_181832.jpg
    20150509_181832.jpg
    82.9 KB
  • 20150509_181851.jpg
    20150509_181851.jpg
    85 KB
Little update. Got the cross ditch dug that connects the far getter drain to the rest of the system.
 

Attachments

  • 20150510_173357.jpg
    20150510_173357.jpg
    81.7 KB
The drainage pipe is all layed and the shop front gutter tied into the system.
 

Attachments

  • 20150510_203836.jpg
    20150510_203836.jpg
    74.7 KB
  • 20150511_085843.jpg
    20150511_085843.jpg
    55.8 KB
  • 20150510_203927.jpg
    20150510_203927.jpg
    66.1 KB
  • 20150510_203828.jpg
    20150510_203828.jpg
    55.8 KB
This week finally got some material delivered---3 truck loads (32 yards) of 1 1/4" minus.
 

Attachments

  • dump2.jpg
    dump2.jpg
    82.8 KB
  • dump.jpg
    dump.jpg
    59.5 KB
It took a couple days and I wish I was better at grading a level surface--but it is pretty close.

Drainage I used 1" clean chip and 1-2 man rock to protect the gutter drain since the material is about 1-2" below the rock surface.

But pretty stroked that its really looking like something now and no more dirt.:awesomework:
 

Attachments

  • 20150723_190924.jpg
    20150723_190924.jpg
    120.5 KB
  • 20150723_211043.jpg
    20150723_211043.jpg
    51.3 KB
  • 20150723_211053.jpg
    20150723_211053.jpg
    63.2 KB
  • 20150723_211106.jpg
    20150723_211106.jpg
    65.5 KB
Back
Top