• Help Support Hardline Crawlers :

Project Peanut Butter Jelly

Braced the kingpins and steering arms today. When the heims show up I'll start double sheering them


444.jpg
 
Tossed the front end back under it

461.jpg


Welded the lower link mounts on the rear axle

455.jpg


Got the basic backhalf structure layed out, obviously still have a bunch more tube to add. The open tube is for a swaybar

452.jpg


Started on the upper link mounts

458.jpg


Here's my $180 box of packing peanuts. It was supposed to be tie rods and heim joints. Thanks USPS :mad::mad:

yeah022-2.jpg
 
Sucks about the shipping bullshit...

I really like the link mounts though...:cool:

Have you called USPS about the shipping issue???
 
Lower link mounts are Blue Torch Fab pieces. Uppers are built by me

yeah014-2.jpg


Ram to rotor clearance, it's pretty tight

yeah017-2.jpg


Rusty mohawk

484.jpg


Tucked the cage in nice and tight. Going to have to cut pieces out of the roof to weld all the joints

yeah013-1.jpg
 
Thanks for all the replies guys! :cool:



You better finish this project! Dont make me come over there and kick yer butt!

:haha:

Not yet, I'll let you know when I lose motivation





Updates are going to be slowing down though, it's wheeling and riding season :fawkdancesmiley:


Teaser, might have to do some trimming


531.jpg


534.jpg
 
Top