• Help Support Hardline Crawlers :

November 1st

The engineer wouldn't sign off on it :mad: it wasn't to the green trail spec's :blabla::frown:

devinporter.jpg
 

I was referring to the vehicle redesign that took place on Nov 1... The rock pile was left with a really big hole and the engineer wouldn't sign off on the really big hole...:haha: I was trying to make a joke I guess everyone missed it...
 
Top