The weekend of Oct 4 and 5 we need to drag logs to their future homes. The logs are currently located on the G11 trail and some need to be taken up to the entrance of the purple line and some will be taken to areas on the G11 trail. The G11 is only covered with the base layer so these logs need to be moved before the big rock gets added. But you will have an opportunity to see the new G11 trail up close. :corn: