crash2
-Oh no I picked a side-
The pics of the construction were taken from Sac-up......looking down onto the final downhill stretch of the upper powerline trail, before it connects to the paved road.
Lake Isabel Trail and Trail of Doom will not / can not be ran until May Creek dies down and the new path can be sorted out. The upper May Creek crossing is VERY DEEP.......so unfortunatley, not an optional route.
This should be fun.:cheer:
That work probably has nothing to do with the road--thats to get there equipment to the tower thats damaged. The road itself is a whole nother deal..