My Shop, My Shop, My Shop!

japerry

Well-Known Member
Joined
Mar 17, 2007
Messages
2,615
Location
Bellingham
Oh man oh man, moved in June and it took a bit to get all the ducks in a row. But basically this is why I haven't been on the trail. I've converted my wheeling time into shop building time so I have a shop so I can fix my junk so I can wheel! .. yah yah yah.

Specs:
28x36 Shop space, 8ft alcoves for storage shed (mower), bathroom, and cutout for an office/game room. Placed on the property so we can eventually tear down the existing garage and build it in front of the new garage.
 
Here is a plot plan of what we plan to do. For now we're keeping the existing garage, and will go around the side.

13%201:15%20AM.jpg


13%201:16%20AM.jpg


9024137728_ddee07bebe_b.jpg


The existing one is 20w x 24l, and the carport was 11' wide, with a space between the garage and fence at 13'.
9021911081_62d8244e47_c.jpg


The first step was to eliminate the carport and rear shed to provide access to the rear. Had to first unbolt the roof from the garage:
9024139482_4505783410_b.jpg


Demo was fairly easy with a e35. We had it down in about 2 hours. The hard part was cleanup. We took about 2.5 tons of wood, roofing, and other debris. It was definitely helpful to separate it out! Each 'roofing' run cost $60-$80.. while wood only cost $15.

9024140278_55cc6e07c3_b.jpg


Only one window casualty!
9021916105_1f4421b215_b.jpg


9024143924_0c76e28fdb_b.jpg


9024145494_f5c296b128_b.jpg


9021919889_06470eacf9_b.jpg


9021922123_ce41b3ecd1_b.jpg


Once we did that, I had a few hours left to start excavating the new driveway and pad for the shop.

9024149650_bc60b28c3d_b.jpg


9021924137_e654504fbf_b.jpg
 
In the middle of August, we finally broke ground.
First, the poles:
1025977_815009333050_79268342_n.jpg


They worked quick! Once the poles were in place, it only took a day to get the trusses put up, and it was only a team of 2!

1397865_815009422870_1527019540_o.jpg


1264799_815009532650_10884731_o.jpg


1399603_815009647420_240316949_o.jpg


1398730_815009702310_532318600_o.jpg


1398269_815009732250_692690443_o.jpg


So it took a day to get the poles placed, and another day to get the roof joists up. Next up, the sides!
 
Getting the sides up took a little more time. But from start to finish they were done in 2.5 weeks.

1375325_815009782150_1761861668_n.jpg


1384258_815009881950_179569459_n.jpg


1390551_815010006700_1715095360_n.jpg


1383499_815010116480_2136933514_n.jpg


1390666_815010186340_1469335408_n.jpg


1385134_815010251210_912715_n.jpg


1391806_815010400910_2112477651_n.jpg


Building done! (well at least the building-building part...)
1383907_815010879950_337530215_n.jpg
 
Next up was figuring out plumbing. What a mess. If it didn't cost ~7500 for someone to do it for me, I wouldn't have taken the time. Its a fairly simple procedure, with a service design as follows:

Blank.jpg


For vanity, I'm not usually a fan of HD stuff, but I ran across this gem:
1376619_815011214280_895408454_n.jpg


Its a utility sink, but doesn't look as ugly, and has a shelf for people to put stuff in. This will be really useful since the bathroom is both for the shop and a potential guest bedroom.

A toto Drake II, because I've never owned a toilet that is as clog-free as this one
toto-drake-model-ndeg-cst454cefg_FF_Model_ID15539_1_TOTO_DrakeII_01.jpg


And an Aquatic 1362NAC -- its one piece, costs $365, and is 36x36, which works great in my 48x84" bathroom.
1362NAC-260x395.jpg
http://aquaticbath.com/products/1362nac/

As for fixtures, I'm not sure yet. My uncle is a Moen rep, so he'll just give me whatever they have sitting at the shop.

I'm still not sure what to do for a water heater. I know its a) going to be electric, and b) needs to fit within the 19" space between the shower and the other wall.

Already ran the PEX line, that was the easy part:
1383858_815011249210_1572203434_n.jpg
 
Electrical
I'm looking at getting this box:
Square D 20-Circuit 20-Space 125-Amp Main Lug Convertible Load Center
785901847861lg.jpg


I want something that is semi-commercial, because I have welding, a EV car, and a few other things going on at once. Its not that much more expensive than the other stuff either.

Here is somewhat of my load plan:
13%2012:46%20AM.jpg


I'm running XHHW-2/0 Aluminum wire from the house, at about 60ft, which should be within voltage drop for 125amps.

Can't wait to get passed on plumbing inspection, then I can lay the concrete!
 
You running an excavator... scary...

How long till the shop is so full of stuff you can't park your rig in it.:fawkdancesmiley:

Looks good Jakob, definitely beats working in the driveway!
 
You running an excavator... scary...

How long till the shop is so full of stuff you can't park your rig in it.:fawkdancesmiley:

Looks good Jakob, definitely beats working in the driveway!

Oh you know, it was just one window in the old garage. The gravel truck did a much better job, ripping off the overhang on the old garage :redneck:

I estimate about 9 months ;) .. actually, the sad fact is it already is full. Between the truck, camper, and Jeep (that parks between the lift posts) there ain't much more room.
 
Electrical
I'm looking at getting this box:
Square D 20-Circuit 20-Space 125-Amp Main Lug Convertible Load Center


I want something that is semi-commercial, because I have welding, a EV car, and a few other things going on at once. Its not that much more expensive than the other stuff either.

Here is somewhat of my load plan:


I'm running XHHW-2/0 Aluminum wire from the house, at about 60ft, which should be within voltage drop for 125amps.

Can't wait to get passed on plumbing inspection, then I can lay the concrete!

Why Aluminum wire from house, instead of Copper?
 

wayyyy cheaper. I think it was something like $178 for the service line vs $400 or so? I would have loved to go copper, but putting some anti-corrosive on the ends is just as sufficient.

I went with Walker Construction out of Battle Ground for the building.
 
Yeah AL is way cheaper then copper the place I bought has 3/0 copper pulled to the shop's 200 amp panel and it's about 200-300 ft from the transformer you wouldt catch me paying for that unless it was from a left over service we were doing

Sweet shop by the way, how many sq feet is it?
 
Last edited:
Nice, yeah any bigger you would end up storing peoples **** or end up hoarding, I couldn't afford to build the size of the shop I ended up with luckily it came with the house and land we bought.
 
Electrical
I'm looking at getting this box:
Square D 20-Circuit 20-Space 125-Amp Main Lug Convertible Load Center
785901847861lg.jpg


I want something that is semi-commercial, because I have welding, a EV car, and a few other things going on at once. Its not that much more expensive than the other stuff either.

Here is somewhat of my load plan:
13%2012:46%20AM.jpg





I'm running XHHW-2/0 Aluminum wire from the house, at about 60ft, which should be within voltage drop for 125amps.

Can't wait to get passed on plumbing inspection, then I can lay the concrete!

You can't get any better than Sq D panels ect is it the homeline or QO panel?
 