Guys,
You might remember the few 6 days projects I shared in the past.
The team from GoldenCoastCustoms is at it again, building another full tube crawler in 6 days.
That's everything from scratch in 6 days, including chassis, interior, wiring, etc, etc. The vehicle will be running and driving on Sunday.
They build in shifts and won't stop for 6 days.
Specs are as follow :
Land Rover V8 3.5L + 5 speed transmission and transfer case from a Range Rover
Nissan Patrol GQ axles
40" trepador tires on Raceline beadlocks
Airschocks, full hydro etc...
They are building it for Cecile, the current owner of my samurai that I sold after moving stateside :
You can watch the build live on youtube :
https://www.youtube.com/watch?v=Rn499-s2ezA
You might remember the few 6 days projects I shared in the past.
The team from GoldenCoastCustoms is at it again, building another full tube crawler in 6 days.
That's everything from scratch in 6 days, including chassis, interior, wiring, etc, etc. The vehicle will be running and driving on Sunday.
They build in shifts and won't stop for 6 days.
Specs are as follow :
Land Rover V8 3.5L + 5 speed transmission and transfer case from a Range Rover
Nissan Patrol GQ axles
40" trepador tires on Raceline beadlocks
Airschocks, full hydro etc...
They are building it for Cecile, the current owner of my samurai that I sold after moving stateside :
You can watch the build live on youtube :
https://www.youtube.com/watch?v=Rn499-s2ezA